01Context
We're a new company. The experience behind it isn't.
Konstrudesch was founded in 2026 by a team that learned the industry's standards from the inside, on some of the country's largest works. The name was new; the craft wasn't.
In construction, clients buy trust before price. The site had to resolve that tension: present a young brand carrying the weight of everything the team had already built.
02The site
Show works, not promises
I structured the site so proof appears before pitch: completed works with their location, concrete areas of expertise and a four-step working method.
- 01A portfolio of real works: paving, bridges, warehouses and hydraulic works.
- 02Four service areas: residential, industrial, roads and airports.
- 03Bilingual ES / EN site for bids and partners abroad.
- 04Direct contact via WhatsApp, the channel the industry uses.
03AI in the process
Designed and built with AI
Structure, bilingual content and code built with AI: I defined the architecture with Claude, built with Claude Code and shipped on Vercel. Less time on production, more time on the message.
- Claude
- Claude Code
- Vercel
04What I took away
- When a brand is new, design has to transfer the team's credibility to the company: evidence weighs more than adjectives.
